Product Details:
|
Cavity: | 3cavity | Runner: | Cold |
---|---|---|---|
Material: | P20 | Back Plate: | Steel S50C |
Machine: | Blowing Machine | Drawing: | CAD. STP. IGS |
Finish Time: | 35workdays | Samples: | Test Provide |
Payment: | 30% Deposit And 70% Balance Before Shipment | Term: | FOB. CRF |
High Light: | 3cavity Custom Blow Mold,Custom Blow Mold 300ml,300ml Plastic Bottle Mould |
3cavity PE material 300ml detergent spray bottle custom blow mold
Technique | Plastic Blowing Mould |
Surface treatment | Sandblast |
Material |
Stainless steel German2316, S136,P20, Alum optional |
Design software | CAD, STP. IGS. X_T |
Plastic mould life | more than 1million shots |
Manufacturing Machines | CNC,EDM,MILLING,WIRE-CUT, etc |
Runner | Cold runner |
Cavity number of mould | 3cavity |
Deflashing system | within auto-deflashing system |
Mould testing | have mould test after mould finish and provide samples for check |
package | In strong wooden case to avoid any damages during shipment |
Description:
This is 3cavity 300ml detergent spray PE bottle mould, the main mould cavity steel is P20, cavity surface do sandblast and structure within auto-deflashing system which cut the neck and bottom extra raw material in mould after blowing finish, and get and good bottle finally which no need worker to cut or tear off the material by hand, more easy and more fast, save production cost.
Normally after sale is one year after mould delivery, JINQIU provide technical support all time.Except for the mold damage caused by human reasons, if the parts are damaged, they can be replaced free of charge
Processing:
Make contract→customer finish down payment→customer provide sample or drawing→JINQIU design details product and mould drawing
→customer approve drawing→JINQIU start make mould→JINIQU test mould and provide samples to customer for check→customer approve
samples or need to adjust→after samples confirmed JINQIU inspection and package mould→customer finish balance→JINIQU prepare for shipment
FAQ:
Q1: Are you factory or trading company?
A: We are factory located in Yuyao City, Zhejiang Province, China
Q2: How to get a quotation and start business relationship with your company?
A: Please send us relate contact information, such as Email, Phone, WeChat, WhatsApp and so on
Q3: How to receive a price quotation in timely?
A: When you send us an enquiry, please kindly make sure all the details, such as how many cavity, runner, mould steel, extra request if have.
Q4: What types of payment terms do you accept?
A: T/T(30% deposit and 70% balance before delivery ), 100% LC at sight
Q5. Before shipment. how to make sure the mould quality?
A: We will supply you mould picture and mould running video
Q6: Can you get samples from you?
A: Yes, after mould finish we will test mould and provide samples for check
Q7: If any quality appear how can you help us to solve?
A: yes, JINQIU provide after-sale technical support, if have mould problem customer have to provide relate photo and video point out the problem, we will check and analysis it help to solve
Q8: how long after sale service and if have any extra free spare parts?
A: free after sale service 1year, extra free spare parts yes have and such as O ring, water connector, spring, ejector pin and son on
Contact Person: Ms. Eileen
Tel: 86-13777933555
Fax: 86-574-62529897