Product Details
Place of Origin: China
Brand Name: jinqiu
Certification: ISO9001
Model Number: JQ-9-3
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: US2000-4000/set
Packaging Details: standard wooden case package, size depend on mould size
Delivery Time: 30-35workdays
Payment Terms: T/T, L/C
Supply Ability: 50sets per month
Structure: |
Common |
Material: |
P20,718H,2316, S136,Alum Optional |
Make Way: |
Blowing |
Cavity: |
Single Cavity |
Design: |
Provide Drawing |
Finish Time: |
30-35workdays |
Payment: |
30% Deposit And 70% Balance Before Shipment |
Package: |
Wooden Case |
Structure: |
Common |
Material: |
P20,718H,2316, S136,Alum Optional |
Make Way: |
Blowing |
Cavity: |
Single Cavity |
Design: |
Provide Drawing |
Finish Time: |
30-35workdays |
Payment: |
30% Deposit And 70% Balance Before Shipment |
Package: |
Wooden Case |
single cavity 1.5L PE material round container home appliance mould
Details sheet:
Make way | Blowing |
Surface treatment | Sandblast |
Material |
718H,stainless steel 2316, but S136,P20 and Alum optional |
Drawing | provide 2D or 3D drawing |
Plastic | HDPE, OR PP |
inspection | check all details and appearance |
Drawing | provide different version |
Cavity number | single cavity |
structure | common main mould |
Mould package | in wooden case |
payment | 30% deposit, and balance after approval samples before shipment |
Description:
This is 1.5L round shape single cavity bottle mould made by steel P20, the surface make in sandblast. This is common deesign mould only main part, the mould running on blowing machine and have product, the up and bottom extra raw material need to tear off by worker. The mould cavity design in full circle of cooling line then connect with water help for cooling during blowing and avoid bottle deformation.
This container are square shape design idea from customer, the 2sides will do labeling. the product wide use in home daily chemical for washing and food and so on
Except for the mold damage caused by human reasons, if the parts are damaged, they can be replaced free of charge, Normally after sale is one year after mould delivery, JINQIU provide technical support all time.
Processing:
Make contract and get deposit→JINQIU design drawing according to customer sample or drawing
→JINQIU start make mould after get drawing approved by customer→JINIQU test mould and provide samples to customer for check till get confirmation→after samples confirmed JINQIU inspection and package mould→customer finish balance→JINIQU prepare for shipment
FAQ:
Q1: Are you factory or trading company?
A: We are factory located in Yuyao City, Zhejiang Province, China
Q2: How to get a quotation and start business relationship with your company?
A: Please send us relate contact information, such as Email, Phone, WeChat, WhatsApp and so on
Q3: How to receive a price quotation in timely?
A: When you send us an enquiry, please kindly make sure all the details, such as how many cavity, runner, mould steel, extra request if have.
Q4: What types of payment terms do you accept?
A: T/T(30% deposit and 70% balance before delivery ), 100% LC at sight
Q5. Before shipment. how to make sure the mould quality?
A: We will supply you mould picture and mould running video
Q6: Can you get samples from you?
A: Yes, after mould finish we will test mould and provide samples for check
Q7: If any quality appear how can you help us to solve?
A: yes, JINQIU provide after-sale technical support, if have mould problem customer have to provide relate photo and video point out the problem, we will check and analysis it help to solve
Q8: how long after sale service and if have any extra free spare parts?
A: free after sale service 1year, extra free spare parts yes have and such as O ring, water connector, spring, ejector pin and son on