Product Details:
|
Cavity: | 12cavity | Runner: | Hot, But Cold Runner Optional |
---|---|---|---|
Material: | German2344 | Cap Material: | PP |
Machine: | 160T | Drawing: | CAD. STP. IGS |
Finish Time: | 45workdays | Package: | Wooden Case |
Payment: | 30% Deposit And 70% Balance Before Shipment | Term: | FOB. CRF |
High Light: | German2344 Medical Device Injection Molding,Medical Injection Mold For PE Round Cap,Medical Injection Mold German2344 |
12cavity D32mm PE round anti proof cap for bottle hot runner medical injection mould
Mould system | Injection Mould |
Cavity number | 12cavity |
Surface treatment | Glossy and Matt |
Runner system | hot runner, cold runner optional |
Mould Material | German2344, 2316,NAK80, H13, ASSAB8407, S136 and so on |
Mould base | China standard, HASCO standard, DME standard. |
Design software | CAD, STP. IGS. X_T |
Plastic mould life | 1-3million shots |
Manufacturing Machines | CNC,EDM,MILLING,WIRE-CUT, etc |
cap material | PP material |
package | In strong wooden case to avoid any damages during shipment |
Description:
This is 32mm round anti proof cap for medicine bottle, material in PE. The cap demould system by stripper plate and do in 12cavity. The core&cavity use German2344, mould base standard P20
The mould can be running on 160T injection machine, automatic demould drop cap can save worker cost and reduce cycle time. do in hot runner don't have runner material which cycle time can reduce 1-2s which improve daily output
Mould processing by complete steps from design to purchase steel material, first step maching, inspection, precision machining, assemble and test, check samples. The mould steel do heat treatment keep strength and work life.
Operational specifications, regular cleaning and maintenance can make the mold life more longer. When we make mould also provide extra some quick-wear spare parts for customer, such as O ring, ejector pin, water connector, spring and so on which easy to replace basic wearing parts. Normally after sale is one year after mould delivery, JINQIU provide technical support all time.
Processing:
Make contract→customer finish down payment→customer provide sample or drawing→JINQIU design details product and mould drawing
→customer approve drawing→JINQIU start make mould→JINIQU test mould and provide samples to customer for check→customer approve
samples or need to adjust→after samples confirmed JINQIU inspection and package mould→customer finish balance→JINIQU prepare for shipment
FAQ:
Q1: Are you factory or trading company?
A: We are factory located in Yuyao City, Zhejiang Province, China
Q2: How to get a quotation and start business relationship with your company?
A: Please send us relate contact information, such as Email, Phone, WeChat, WhatsApp and so on
Q3: How to receive a price quotation in timely?
A: When you send us an enquiry, please kindly make sure all the details, such as how many cavity, runner, mould steel, extra request if have.
Q4: What types of payment terms do you accept?
A: T/T(30% deposit and 70% balance before delivery ), 100% LC at sight
Q5. Before shipment. how to make sure the mould quality?
A: We will supply you mould picture and mould running video
Q6: Can you get samples from you?
A: Yes, after mould finish we will test mould and provide samples for check
Q7: If any quality appear how can you help us to solve?
A: yes, JINQIU provide after-sale technical support, if have mould problem customer have to provide relate photo and video point out the problem, we will check and analysis it help to solve
Q8: how long after sale service and if have any extra free spare parts?
A: free after sale service 1year, extra free spare parts yes have and such as O ring, water connector, spring, ejector pin and son on
Contact Person: Ms. Eileen
Tel: 86-13777933555
Fax: 86-574-62529897