Send Message
Yuyao Jinqiu Plastic Mould Co., Ltd.
Yuyao Jinqiu Plastic Mould Co., Ltd.
products
Home /

products

16cavity Medical Injection Moulding PP Round Cover For Bottle Hot Runner

Product Details

Place of Origin: China

Brand Name: jinqiu

Certification: ISO9001

Model Number: JQ-5-7

Payment & Shipping Terms

Minimum Order Quantity: 1set

Price: USD8000-20000/set

Packaging Details: standard wooden case package, size depend on mould size

Delivery Time: 45-60workdays

Payment Terms: L/C, T/T

Supply Ability: 50sets per month

Get Best Price
Contact Now
Specifications
Highlight:

16cavity Medical Injection Moulding

,

Medical Injection Moulding PP Round Cover

,

Medical Injection Mold 16cavity

Cavity:
16cavity
Runner:
Hot Runner-YUDO
Material:
German2344
Cap Material:
PP
Machine:
160T
Drawing:
CAD. STP. IGS
Finish Time:
45workdays
Package:
Wooden Case
Payment:
30% Deposit And 70% Balance Before Shipment
Term:
FOB. CRF
Cavity:
16cavity
Runner:
Hot Runner-YUDO
Material:
German2344
Cap Material:
PP
Machine:
160T
Drawing:
CAD. STP. IGS
Finish Time:
45workdays
Package:
Wooden Case
Payment:
30% Deposit And 70% Balance Before Shipment
Term:
FOB. CRF
Description
16cavity Medical Injection Moulding PP Round Cover For Bottle Hot Runner

16cavity D24mm PP round cover for bottle hot runner medical injection mould

 

Mould system Injection Mould
Cavity number 16cavity
Surface treatment Glossy and Matt
Runner system hot runner, cold runner option
Mould Material German2344, 2316,NAK80, H13, ASSAB8407, S136 and so on
Mould base China standard, HASCO standard, DME standard.
Design software CAD, STP. IGS. X_T
Plastic mould life 1-3million shots
Manufacturing Machines CNC,EDM,MILLING,WIRE-CUT, etc
cap material PP material
package In strong wooden case to avoid any damages during shipment

 

 

Description:

 

This is 24mm round PP cap for medicine bottle. The cap demould system by oil motor scrwing out and do in 16cavity. The core&cavity use German2344, mould base standard S50C

 

The mould can be running on 160T injection machine, do in hot runner not have runner material save raw material cost, automatic demould drop cap can save worker cost and reduce cycle time. 

 

Mould processing by complete steps from design to purchase steel material, first step maching, inspection, precision machining, assemble and test, check samples. The mould steel do heat treatment keep strength and work life.

 

Operational specifications, regular cleaning and maintenance can make the mold life more longer. When we make mould also provide extra some quick-wear spare parts for customer, such as O ring, ejector pin, water connector, spring and so on which easy to replace basic wearing parts. Normally after sale is one year after mould delivery, JINQIU provide technical support all time.

 

Processing:

 

Make contract→customer finish down payment→customer provide sample or drawing→JINQIU design details product and mould drawing

→customer approve drawing→JINQIU start make mould→JINIQU test mould and provide samples to customer for check→customer approve

samples or need to adjust→after samples confirmed JINQIU inspection and package mould→customer finish balance→JINIQU prepare for shipment

 

16cavity Medical Injection Moulding PP Round Cover For Bottle Hot Runner 016cavity Medical Injection Moulding PP Round Cover For Bottle Hot Runner 1

 

 

FAQ:

 

Q1: Are you factory or trading company?

A: We are factory located in Yuyao City, Zhejiang Province, China

 

Q2: How to get a quotation and start business relationship with your company?

A: Please send us relate contact information, such as Email, Phone, WeChat, WhatsApp and so on

 

Q3: How to receive a price quotation in timely?

A: When you send us an enquiry, please kindly make sure all the details, such as how many cavity, runner, mould steel, extra request if have.

 

Q4: What types of payment terms do you accept?

A: T/T(30% deposit and 70% balance before delivery ), 100% LC at sight

 

Q5. Before shipment. how to make sure the mould quality?

A: We will supply you mould picture and mould running video

 

Q6: Can you get samples from you?

A: Yes, after mould finish we will test mould and provide samples for check

 

Q7: If any quality appear how can you help us to solve?

A: yes, JINQIU provide after-sale technical support, if have mould problem customer have to provide relate photo and video point out the problem, we will check and analysis it help to solve

 

Q8: how long after sale service and if have any extra free spare parts?

A: free after sale service 1year, extra free spare parts yes have and such as O ring, water connector, spring, ejector pin and son on

 

 

Send your inquiry
Please send us your request and we will reply to you as soon as possible.
Send